RAZ-200KW high frequency heating machine

  • Description

1. Industry application:



1. Welding

1) Welding of carbide tools. Such as turning tools, milling cutters, reamer.

2) Welding of diamond bits. Such as diamond saw blades, abrasive tools, sawtooth welding. Welding of drill bits for prospecting, such as welding of a sub-drill and a claw bit.

3) Composite welding of metal materials such as brass, copper, stainless steel, etc.

2. Heat fitting and heat fusion equipment

1) The heating of the motor rotor and the water pump shell, and the heating of the bearing sleeve. Thermal fusion of plastic handle of tableware, etc.

2) Heating lamination of aluminum-plastic pipes, cables and wires; aluminum foil sealing used in food, beverage, and pharmaceutical industries, preheating expansion of metals, etc.

3. Quenching

Surface, inner hole, partial or overall quenching of various hardware tools, electric, hydraulic, pneumatic components, auto parts, motorcycle parts and other mechanical metal parts

4. Annealing equipment

It can perform overall or partial annealing treatment for various mechanical parts, and tensile annealing for stainless steel products within a diameter of 50

1) Heat the metal material for stretching, molding, embossing, etc. Such as steel pipe stretching, pipe bending, head smashing; iron wire, steel wire heating nailing

3) Heating and annealing metal materials. Such as steel pipe drawing, pipe bending; smashing head, iron wire, steel wire heating nails, stainless steel products

5. Smelting

1) Melting gold/copper/silver: 1-5kg

2) molten steel/aluminum: 1-3kg


2. Main features:

1. Simple installation, only need to connect electricity and water to use, no need for special installation

2. Easy to operate: you can learn in a few minutes

3. Quick start: the heating can be started after the water is turned on

4. Less power consumption: Compared with old-fashioned high-frequency equipment, it saves power, and the smaller the workpiece, the less power consumption

5, the effect is good: the heating is very uniform, the temperature rises quickly, and the oxide layer is less.

6. Adjustable power: adjustable output power

7. Full protection: with overvoltage, overcurrent, overheating, water shortage and other alarm indications, and automatic control and protection


 

3. Operation steps

RAG-15KW高頻加熱機剪刀淬火

1. Water: Start the water pump and observe whether the water flow at the water outlet is normal.

2. Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3. Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4. Start: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5. Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6. Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7. Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch at the rear of the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


 

4. Precautions for use

RAG-15KW高頻加熱機

1. In order to prevent electric shock, please ensure that the electrical specifications of the casing are reliably grounded.

2. The removal and installation of the sensor must be carried out after the heating stops.

3. Strictly implement the principle of water first and then electricity. Water shortage is strictly prohibited during the working process. The water quality and pressure of the cooling water inside the equipment and the sensor must meet the requirements of Table 2. In order to avoid blocking the cooling pipeline, if the water supply is supplied by a water pump, please install a filter at the water inlet of the water pump. The cooling water temperature should not be higher than 45°C, and the water flow rate should be 10T/h (softened water is recommended)

4. The equipment should be protected from sunlight, rain, moisture, dust, etc. When repairing or maintaining the equipment is required, it must be done one hour after the power is turned off.

5. In-machine cleaning method Blown with compressed air or blower every week. The circuit board is cleaned with a brush and then blown clean.

6. Ordinary users should clean the waterway of the machine with a special descaling agent (available from our company) every 4 months. When the machine frequently alarms the water temperature, or observes that the water flow of the water outlet decreases significantly, it should be cleaned immediately.

7. The sensor should be kept clean to prevent short circuit between turns.

8. This device cannot use single-turn inductors. Otherwise, the device may be damaged due to too small inductive reactance. In special cases, please consult the manufacturer.

9. When replacing the sensor, the contact surface between the sensor connection board and the transformer should be cleaned with sandpaper to maintain good electrical conductivity.

 

5. Technical parameters

model

RAG-15KW


model

RAZ-200KW

power

15KW


power

 25KW

Input current

23A


Input current

32A

Oscillation frequency

30-100KHZ


Oscillation frequency

30-100KHZ

Input voltage

單相220V


Input voltage

three phase380V

molten gold

1-3kg


molten gold

1-5kg

volume(cm)

42*20*36


volume(cm)

57*22*46

weight(KG)

20


weight(KG)

28

 

6. Troubleshooting and troubleshooting

Fault

possible reason

Solution

After turning on the power switch, the "Power" indicator does not light up

1 The panel power switch is in poor contact

21P air circuit breaker trip

3 Phase loss

1 Close and open, repeat several times

21P air open to send on

3 Check the power supply voltage

After stepping on the foot switch, the work light does not light up

1 Foot switch lead off

2 The AC contactor is not closed or the contact is poor

3 Poor contact of the sensor

1 Check the foot switch lead wire or AC contactor or sensor

Adjust the panel power to the maximum, no current indication or the current is too small

1 The number of turns of the inductor is too much or the load is too heavy

2 sensor short circuit

3 Poor contact at the sensor

4 half bridge work

1 Reconfigure the sensor

2 reboot after separation and it works fine

3 Grinding or pickling at joints

4 Contact the manufacturer

The workpiece cannot be heated after being placed

1 The external power supply capacity is small or the wire is too thin

2 phase loss

3 The number of turns of the inductor is too much or the load is too heavy

4 half bridge work

1 Increase the power capacity

2 Check the three-phase power supply

3 Reconfigure the sensor

4 Contact the manufacturer

Overcurrent alarm

1 The contact of the sensor is bad or short circuit

2 The contacts of the AC contactor are in poor contact

3 Too many or too few turns of the inductor

4 ignition at the external power connector

5 Poor contact of high-frequency cables

6 Power board failure

7 There is a spark inside

8 The resonant transformer is bad

1 Check the sensor, high frequency cable, external power supply

2 Replace the AC contactor

3 Reduce the number of inductor turns

4 Check the power tube

water pressure alarm

1 The water pressure is too low

2 limescale clogging

3 The water pressure switch is broken

1 Increase the water pressure

2 Clean the limescale

3 Replace the water pressure switch

water temperature alarm

1 The water temperature is too high

2 The water flow is too small

3 water pipe blockage

4 Too much scale inside

1 Change the cooling water

2 Increase the water pump or water pressure

3 Clean with descaling agent 1 40

4 Replace the water temperature relay

Recommended Products

HOME About Us Product News Case Video Advantages Contact
少妇激情一区二区三区视频| 精品久久久久久亚洲精品 | 精品国产一区二区三区AV 性色| 无码免费一区二区三区| 国产成人MV在线播放| 少妇性活BBBBBBBBB小说| 吃瓜网最新官网地址| 日韩人妻一区二区三区免费| 成人AV无码一区二区三区| 人妻有码ΑV中文字幕久久琪琪布| CHINESE东北嫖妓女HD| 欧美日韩在线视频| FREEXX性黑人大战欧美| 欧美群交性爱视频| WWW久久只有这里有精品| 欧洲VODAFONEWIFI巨| IJZZIJZZIJ亚洲大全| 趴下老子要从后面CAO你| JJZZJJZZ高潮喷水妇女| 人妻在厨房被侮辱高清版| 波多波多野结衣中文无| 日本VA欧美VA欧美VA精品| 草莓视频APP在线下载| 日产乱码一二三区别免费下 | 无码少妇一区二区性色AV| 国产精品乱子伦XXXX| 性av 丰满av 无码av| 国内揄拍高清国内精品对白| 亚洲成a人蜜臀AV在线播放| 极品尤物爆乳自慰呻吟| 亚洲熟妇AV日韩熟妇在线| 久久久久精品国产亚洲AV电影| 亚洲综合国产一区二区三区| 伦人伦XXX国产对白| 99久久免费国产精品2021| 秋霞AV鲁丝片一区二区| 大荫蒂又大又长又硬又紧| 天堂√在线中文最新版8| 亚洲欧美一区二区成人片牛牛| 老阿姨哔哩哔哩B站肉片入口6| 无码喷水一区二区浪潮AV | 国外B站推广网站| 无码人妻少妇伦在线电影| 国产精品三级AV三级AV三级| 小婷又紧又嫩又窄又多水| 狠狠躁天天躁中文字幕| 亚洲日韩乱码久久久久久| 老男人把舌头伸进我下面| 18禁黄污无遮挡无码网站| 人妻大战黑人白浆狂泄| 粉嫩一区二区三区性色AV| 无码精品日韩专区| 精品水蜜桃久久久久久久| 又硬又粗又大一区二区三区视频| 欧美成人猛片AAAAAAA| 成人无遮挡裸免费视频在线观看| 无码福利日韩神码福利片| 精品国产_亚洲人成在线| 又色又爽又黄的视频软件APP| 欧美高大丰满FREESEX| 大乳丰满人妻中文字幕日本| 西西人体大胆4444WWW| 久久EE热这里只有精品| 80岁老熟妇乱子伦牲交| 色窝窝无码一区二区三区| 国产午夜鲁丝片AV无码| 一边做饭一边躁狂我会怎么样呢| 欧洲人激情毛片无码视频| 国产成人AV大片在线播放| 亚洲妇女无套内射精| 美女裸体18禁免费网站| 成熟交BGMBGMBGM| 亚洲AV无码国产精品色午| 老司机67194精品线观看| 爆乳JK美女脱内衣裸体网站| 小嫩模无套内谢第一次| 久久亚洲精品国产精品| 草草永久地址发布页①| 亚洲AV成人无码网站大全| 鲁一鲁AV2019在线| 成人A级毛片免费观看AV不卡| 性色AV免费网站| 美女又大又黄WWW免费网站| 成人影院YY111111在线| 亚洲国产成在人网站天堂| 奶头好大揉着好爽视频午夜院| 抖抈APP免费下载国际版| 亚洲国模私拍人体GOGO| 欧美性色欧美A在线播放| 国产精品自产拍高潮在线观看| 一二三四在线观看视频韩国| 揉着我的奶从后面进去| 精品人在线二线三线区别 | 国99久9在线 | 免费| 亚洲色婷婷六月亚洲婷婷6月| 人妻少妇偷人精品视频| 国精产品一区二区三区糖心 | 西方38大但人文艺术| 蜜臀AⅤ永久无码一区二区| 国产成人精品久久久久| 伊人久久大香线蕉无码不卡| 少妇丰满大乳被男人揉捏视频 | 啊灬啊灬快点灬用力岳| 亚洲AV无码专区成人网址| 欧美极品另类ⅤIDEOSDE| 国产欧美精品一区二区三区-老狼| 与亲女洗澡伦了东北| 他趴在两腿中间舔我私密有事| 久久99精品国产99久久| 成人午夜高潮刺激免费视频| 亚洲啪啪AV无码片| 色欧美片视频在线观看 | 夫前人妻被灌醉侵犯在线| 夜夜嗨AV一区二区三区| 丝瓜草莓榴莲向日葵秋葵| 麻豆视传媒官方直接进入| 雨后小故事完整版| 无码人妻久久一区二区三区APP| 男女无遮挡高清视频免费看| 国产色欲色欲色欲.WWW| JAPAN丰满少妇VIDEOS| 亚洲VA中文字幕无码一区| 日本XXX色视频在线观看| 久久精品国产69国产精品亚洲| 丰满人妻被公侵犯日本| 中国美女撒尿TXXXX视频| 西西444WWW无码大胆| 轻点灬大JI巴太粗太长了| 精品无人区卡卡二卡三乱码| 疯狂做受XXXX高潮视频免费 | 涩反差合集91综合一区二区清纯| 老狼一区忘忧草欢迎您大豆男男| 国产精品一区在线观看你懂的| 99久久久无码国产精品免费| 亚洲精品无码少妇30P| 手机在线看永久AV片免费| 男人吵架后疯狂要你什么心理| 好男人日本社区WWW| 粉嫩虎白女P虎白女在线| 中文无码伦AV中文字幕在线 | 久久影院午夜伦手机不四虎卡| 国产精品美女久久久网站| JIZZJIZZ亚洲日本少妇| 亚洲综合激情七月婷婷| 无码人妻少妇伦在线电影| 区二区三区国产精华液区别大吗 | 人人爽人人澡人人人人妻| 久久综合狠狠综合久久综合88| 国产无套无码AⅤ在线观看| 边做饭边被躁BD小说| 中国少妇BBWBBW| 亚洲VA欧美VA国产VA综合| 熟妇人妻不卡中文字幕| 欧美性猛交XXXX乱大交| 久久综合亚洲鲁鲁九月天| 黑人精品XXX一区一二区| 国产成人无码免费视频在线 | 亚洲国产A∨无码中文777| 天天看AV片在线观看| 日本VA欧美VA精品发布| 久久夜色精品国产| 精品国产乱码久久久久久蜜桃免费| 国产精品成熟老女人视频| 成 人 免 费 黄 色| 97国语精品自产拍在线观看一| 亚洲综合久久一本久道| 亚洲AV永久无码精品无码流畅| 无码高潮爽到爆的喷水视频| 日日噜噜夜夜狠狠久久无码区| 欧美一级 片内射黑人i| 美丽女邻居交换5完整版| 久久69精品久久久久久HB| 国精产品一区二区三区糖心 | 亚洲国产精品成人网址天堂| 午夜精品久久久久久久久| 色欲蜜臀AV在线播放| 日本理伦片午夜理伦片| 欧美性爱乱伦视频| 女人扒开屁股桶爽6O分钟| 麻花豆传媒剧国产免费| 久久久久人妻一区精品色欧美| 娇妻被朋友玩得呻吟在线电影| 国产无套中出学生姝| 国产精品无码2021在线观看| 丰满少妇人妻XXXXX| 成人亚洲色欲色一欲WWW| 把腿张开老子cao烂你在线视频| AV无码精品一区二区三区| 19岁MACBOOKPRO高清| 在线成人精品国产区免费| 野花日本大全免费观看3中文版| 亚洲日韩中文无码久久| 亚洲欧美日本韩国| 亚洲另类无码专区首页| 亚洲成A人片在线不卡一二三区| 亚洲AV无码成人精品国产| 亚洲AV成人精品日韩一区麻豆 | 在线无码免费网站永久| 幼儿HIPHOP仙踪林的功能| 伊人色综合九久久天天蜜桃 |